Parkway Pipeline Project

Energy, Midstream
TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-78.jpg
TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-127.jpg

The Challenge

The pipeline company needed to construct a 135-mile-long pipeline to transport refined liquid petroleum products from St. James, Louisiana to Liberty, Mississippi. Professional surveying and environmental services were required before construction could begin.

TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-200.jpg

The Solution

TBS provided professional surveying services, including right-of-way plat preparation, construction stakeout, and as-built survey services, hydrographic survey services, preliminary and as-built alignment sheet preparation. Additionally, TBS provided wetland delineations and protected species surveys in an effort to obtain all environmental permits required to proceed with construction of the 135-mile-long, 16-inch diameter, refined liquid petroleum products pipeline.

Services

Alignment Sheets

Right-of-Way Plats

As-Built Survey

Environmental Surveys & Permitting

Construction Staking