The Challenge
The pipeline company needed to construct a 135-mile-long pipeline to transport refined liquid petroleum products from St. James, Louisiana to Liberty, Mississippi. Professional surveying and environmental services were required before construction could begin.
The Solution
TBS provided professional surveying services, including right-of-way plat preparation, construction stakeout, and as-built survey services, hydrographic survey services, preliminary and as-built alignment sheet preparation. Additionally, TBS provided wetland delineations and protected species surveys in an effort to obtain all environmental permits required to proceed with construction of the 135-mile-long, 16-inch diameter, refined liquid petroleum products pipeline.
Services
Alignment Sheets
Right-of-Way Plats
As-Built Survey
Environmental Surveys & Permitting
Construction Staking