The Challenge
The pipeline company needed to construct a 135-mile-long pipeline to transport refined liquid petroleum products from St. James, Louisiana to Liberty, Mississippi. Professional surveying and environmental services were required before construction could begin.
![TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-200.jpg](https://static.wixstatic.com/media/04f25a_75db35a4db734fcd972192a72594ac66~mv2.jpg/v1/fill/w_980,h_654,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-48.jpg)
The Solution
TBS provided professional surveying services, including right-of-way plat preparation, construction stakeout, and as-built survey services, hydrographic survey services, preliminary and as-built alignment sheet preparation. Additionally, TBS provided wetland delineations and protected species surveys in an effort to obtain all environmental permits required to proceed with construction of the 135-mile-long, 16-inch diameter, refined liquid petroleum products pipeline.
Services
Alignment Sheets
Right-of-Way Plats
As-Built Survey
Environmental Surveys & Permitting
Construction Staking